Step 3 · Build & Validate

Pilot, PoC & Validation Methods for Robo Claw at Large-Scale Warehouses and Distribution Centers

Working from the requirements defined in Refine, build the Agents, Skills, and Tool Policies for a scope limited to a single warehouse and a single process, validate them across normal and exception scenarios, inventory discrepancies, duplicate execution, human approval, and rollback, and confirm they meet the criteria for moving into production.

Bottom Line

Narrow the Pilot to one warehouse and one process, and validate not only the normal path but also exception scenarios (WMS connection failures, insufficient permissions, erroneous updates, duplicate execution) along with rollback and the procedure for switching to manual operation. Skipping exception testing makes problems such as erroneous inventory updates far more likely to surface once you are running in production.

Who This Is For

Who This Is For

This article is for warehouse operations leads, WMS administrators, and IT staff who have already firmed up their requirements in the Refine step.

What You'll Decide

What You'll Decide in This Step

In Build & Validate, you finalize the scope of the Pilot, build the Agents, Skills, and Tools, run tests for both normal and exception scenarios, and assess whether the results meet the criteria for moving into production.

Industry Challenges

Challenges Specific to Large-Scale Warehouses and Distribution Centers

01

Preparing test data is difficult

Actual inventory data and business-partner information cannot be used for testing as-is, so preparing test data takes time.

02

Exception scenarios are easy to overlook

Normal inbound and outbound flows are straightforward to validate, but exception cases such as WMS connection failures and erroneous updates are often left out of scope.

03

Risk of duplicate execution and erroneous updates

Scheduled runs and retry processing create the risk that inventory quantities are updated twice, or overwritten with stale data.

04

Criteria for moving to production are vague

In many cases the criteria for judging whether Pilot results justify a move to production have not been set in advance.

Method

Implementation Steps

1. Fix the scope of the Pilot

Narrow it to one warehouse and one process, and design the Pilot around a scope that is easy to validate.

2. Build the Agent, Skill, and Tool

Build the Agent needed for the target process, the Skill covering the operating procedure, and the Tool for WMS operations.

3. Configure the Tool Policy

Define, as a Policy, the range of operations a Tool is allowed to perform (read/write, Allow/Deny).

4. Prepare test data

Prepare test inventory data modeled on real data, and build a validation environment that contains no confidential information.

5. Test normal scenarios

Confirm that the inbound/outbound checks, daily report creation, and discrepancy detection flows work as expected.

6. Test exception scenarios

Check exception scenarios such as WMS connection failures, insufficient permissions, erroneous updates, and duplicate execution.

7. Verify human approval and rollback

Confirm that the approval flow works as designed and that you can return to the previous state when a problem occurs.

8. Run user acceptance testing

Have the warehouse operators and WMS administrators who will actually use it try it out, and confirm it is workable in practice.

Test Scenarios

Pilot Evaluation Table

The following are examples of validation items. Record each result on a scale such as three levels — pass, conditional pass, fail — and use it as the basis for the production go/no-go decision.

Validation itemExample scenarioWhat to check
Normal scenarioRoutine inbound/outbound checks and daily report creationWhether the expected drafts and organized results are produced
Exception (WMS failure)Connection failure to the WMSWhether it stops safely on error without emitting incorrect information
Exception (duplicate execution)Overlapping or re-run scheduled executionsWhether inventory quantities are updated twice (idempotency)
Human approvalApproval of an inventory quantity changeWhether updates can occur without approval, and whether an approval record is kept
RollbackReverting after an erroneous updateWhether the previous state can be restored quickly

Data & Systems

Data and Systems Used

Test inventory data Test inbound/outbound data Tool Policy configuration WMS connection in the validation environment Logging and monitoring tools

Human-in-the-loop

Where Human Approval Is Required

  • A test owner reviews and approves whether the inventory update proposals and daily report drafts generated in the Pilot should be applied
  • The IT department and WMS administrators review the Tool Policy configuration
  • An accountable owner decides on the move to production based on criteria defined in advance

Measurement

KPI

Test scenario pass rate

The share of normal and exception scenarios that passed

Number of erroneous updates and duplicate executions

The number of incorrect operations and duplicate processes detected during the Pilot

User acceptance rating

Actual users' assessment of usability and fit with their work

Pitfalls

Common Pitfalls

01

Declaring a pass based on normal scenarios alone

If you skip validating exception cases, the behavior during a WMS failure will be unexpected once you are running in production.

02

Testing with production inventory data

Using real inventory and business-partner information from the validation stage raises the risk of erroneous updates and information leakage.

03

Not preparing a rollback procedure

Without a procedure for reverting when a problem occurs, recovery takes longer and the impact on operations grows.

Go / No-Go Criteria

Production Go/No-Go Checklist

  • All normal scenarios have passed
  • Exception scenarios (WMS failure, duplicate execution, erroneous update) have been validated
  • The human approval flow works as designed
  • A rollback procedure is in place and reverting has actually been verified
  • Operations outside granted permissions have been confirmed to be denied
  • Practical issues raised in user acceptance testing have been resolved
  • A procedure for switching to manual operation during an outage is in place

FAQ

Frequently Asked Questions

Roughly how long should a Pilot run?

It varies with the target process and the complexity of the WMS integration. We cannot give a single fixed duration, so please contact us for an individual discussion based on your scope.

Can we validate without using production inventory data?

Yes. We recommend preparing test data modeled on real data and running the validation in an environment that contains no confidential information.

What happens if the Pilot fails?

You revisit the requirements and Tool Policy from Refine and run the Pilot again. We recommend not forcing a move to production, and continuing validation until the criteria are met.

Shall we organize a warehouse operations pilot together?

The scope of targets, test scenarios, and criteria for production transition can be specified through consultations in the official LP.

Consult about a warehouse operations pilot.